In the installation process of steel structure workshop, if there is a slight error in one stage, it will harm the overall stability of steel structure workshop. So do a good job to prevent is a top priority, then, how to solve the installation error of Foshan steel structure factory? Let's go to understand the following:
1, steel structure workshop into the spot should be spot check and measurement, the deformation deviation should be immediately corrected to solve, after the standard can be installed.
2. Check and correct whether the measuring instrument is in good condition and whether the metrological verification is due to ensure the precision of the measuring instrument.
3, steel structure workshop in the production of the steel structure workshop to take into account the load on the reduced deformation value of the steel structure workshop and the value of the closing deformation of the joint head welding, the construction site strictly control the welding closing deformation, pay attention to the basic foundation settlement change.
4, choose the appropriate time measurement, to ensure the measurement accuracy.
5. After steel structure engineering, reliable temporary fixed immovable countermeasures shall be adopted, or firm modules shall be produced to ensure the safety of steel structure installation.
6, the steel structure workshop installation error beyond the allowable error of the steel structure workshop to be adjusted immediately, the deviation of the steel structure workshop can not be adjusted to record the measured value, after the design scheme and the relevant enterprises are willing to accept the visa for archiving.