Steel structure installation procedures include steel column installation, column bracket installation, temporary positioning of steel crane beams, roof beams, roof brackets, steel crane beams and other calibration and fixing, and maintenance structure installation. Due to the heavy weight and long length of the steel column, one-off production and transportation are impossible. Therefore, the method of segmented production, overall assembly on site, and then hoisting is adopted. The steel column is to be produced in two sections. The steel column is transported to the site in two parts: the lower lattice part and the upper H-shaped steel column. The weight of the steel column is about 6 tons, and the height of the steel column is about 17 meters. The 50t truck crane can meet the hoisting requirements, and the 25t truck crane is used for hoisting.
Main steel frame | H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe |
Secondary frame | hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc. |
Roof panel | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet |
Wall panel | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Drawing | We can make the design and quotation according to your require or your drawing |