Most of the embedded parts are metal structures. Thick steel plates and anchor bars are set aside in advance in the structure, which can be used for prefabricated components of the buckle structure. It can be used as a connection when the process is fixed and fixed. In general, the embedded parts need to be produced and processed according to the engineering drawings first, and then the accurate positioning of measurement and the support frame are carried out. In addition to removing the marble curtain wall, the management center of the embedded parts is aligned with the two ends of the separation seam of the curtain wall. And according to the size of the beam, the installation site is clear and then the template on the side of the beam is sealed.
If the location of the embedded parts installation, as well as the level before and after the three aspects of error is big, will make the bearing point installation produces serious quality problem, make a lot of can not use the embedded parts, the other is due to the curtain wall structure of the quality problem, cause the rain leakage occurs, affect the service life of the embedded parts, as well as the usage of the building. We want to ensure that the quality of embedded parts can not be destroyed in any case, welding and reinforcing the bracket, do not appear loose, collapse phenomenon.